University of Washington

Student Housing - Maple and terry halls, Seattle, WA

building total area

440,000 SF

completion date

Beginning of 2016

total construction cost

$113,000,000

owner

University of Washington

a/e team

Mithun

Rushing

Travis, Fitzmaurice & Assoc

construction team

WG Clark

Holaday Parks

Cochran 

 

safeco-a.jpg
 

project description

This project included the demolition of the existing 1101 Café and Terry Hall, and the construction of two new residential buildings named Maple Hall and Terry Hall. These new eight-story residential buildings include five wood-frame stories of housing, above a concrete plinth, consisting of two-bedroom suites, all with private bathrooms. The lower two floors of each building are occupied by housing and food service administration offices, common space for students, and some additional two-2 bedroom suites. A below grade parking garage connected to the Lander Hall garage and the Lander Hall loading dock extends below the new Maple and Terry residence halls. The two new buildings total approximately 440,000 square feet, with a target bed count of 1150 beds.

services provided

Wilson Jones Commissioning was retained to provide design, construction and acceptance/closeout phase commissioning authority services. Services included reviewing the Owner design narrative, OPR, DD and CD, and providing integrated commissioning specifications for inclusion into the construction bid documents.  WJCx worked collaboratively with the Owner, GC/CM, MC/EC and design team to develop a commissioning plan and commissioning schedule to keep the team up to date on goals and responsibilities. WJCx also created System Manuals and Functional Performance Tests to ensure systems were operating properly and system function was well documented. At the end of the project, LEED documentation for the fundamental and enhanced commissioning credits was completed and submitted.

systems tested

Chilled Water System, Boiler Heating Hot Water System, Heat Recovery (Condenser Water) Heat Exchangers and Pumping including Heating/Cooling Staging, Air Handling Units, Water to Water Heat Pumps including Interface To Heat Recovery and Domestic Hot Water, Water to Air Heat Pumps, Air to Air Rooftop Heat Pumps, Variable Refrigerant Flow Systems, Loading Dock/Garage CO2 Exhaust Fan Ventilation System, Supply and Exhaust Fan Systems, Air Terminal Units, A/C Units, Fan Coil Units, Electric Heaters, Stairwell Fan Pressurization Systems, Interfaces to Fire Alarm Systems and Emergency Power Systems, TAB back-checking of Preliminary TAB Report (10% sampling), Verification of Metering Calibration and Interface to Dashboard(s), Trending of All DDC Analog Loops.