building total area
28,000 SF
completion date
2010
total construction cost
$11,000,000
owner
Epiphany School
a/e team
Miller Hull Partnership Architects
Sider + Byers Mechanical
Interface Engineering Electrical
construction team
Sellen Construction
project description
This project involved the construction of a new 28,000 square foot lower elementary school in downtown Seattle to expand the current Epiphany School. This venture added 17,500 sqft. of new classroom space as well as 10,500 sqft. within a new parking structure. The project had a very strong emphasis towards green building and sustainability.
services provided
Wilson Jones Consulting, LLC was hired by the Owner to provide Commissioning Services. WJC was responsible for the development and execution of the installation audits, start up oversight and functional performance testing. WJC also developed the commissioning plan, commissioning specifications, 100% DD review for LEED, and 95% DC review for LEED. During the construction phase, WJC kept and updated a commissioning issues matrix, led weekly commissioning meetings, produced the re-commissioning systems manual for LEED, provided oversight of the Owner training, reviewed the O&M documentation, and conducted a “near end of warranty” review for LEED.
systems tested
1 ground source loop and circulation pump system, 7 radiant floor heating systems, 1 rooftop air handling unit, 2 heat recovery units, 1 split system A/C unit, 26 solar exhaust fan systems, 2 CO2-controlled garage exhaust fan systems, 1 mechanical room ventilation fan, 2 toilet room exhaust fan systems, and lighting control systems.