building total area
25,000 SF
completion date
2011
total construction cost
$21,000,000
owner
University of Washington School of Medicine, Dept of Microbiology
a/e team
Ambia, Inc Architects
Affiliated Engineers–Mechanical
Affiliated Engineers-Electrical
construction team
BN Builders
project description
The project involved the renovation of the existing J Wing, University of Washington, School of Medicine, Department of Microbiology laboratory. The project updates the lab research, academic and support areas to improve the space and provide a better more cohesive environment for personnel and a more modern space for collaborative research.
services provided
WJCx is provided comprehensive LEED commissioning services including, design reviews, commissioning plan development, commissioning installation audits, start up oversight, commissioning functional performance testing, O&M documentation review and owner training oversight, providing system manuals and near end review to meet LEED requirements and to ensure the best operating building possible.
systems tested
Chilled water system, heating water system heat recovery systems, existing air handling systems, exhaust air systems, miscellaneous plumbing systems, low voltage electrical and lighting systems, intersystem operations.