Washington State Department of Corrections
Stafford Creek, Phase II, Seattle, WA
building total area
200-acre site
completion date
Phase Iā2002
total construction cost
30,000,000
owner
State of Washington Department of Corrections
a/e team
NBBJ Architects
Coffman Mechanical Engineers
Sparling Electrical Engineers
construction team
Pease and Sons Gen. Contractor
Pease and Sons Mech. Contractor
Siemens DDC Control Contractor
project description
This addition to the existing Phase I corrections center provided housing units for 544 more beds to the facility for the State of Washington. The additional buildings included two new housing units and a new laundry facility.
The HVAC systems incorporated a complex smoke evacuation mode, allowing the safe and orderly egress of inmates during a lockdown condition. The new laundry facility incorporates a new 300BHP steam boiler and heat recovery system.
services provided
WJCx was sub-contracted by the Commissioning Agent to provide Test Engineer services. WJCs performed design reviews, wrote/executed functional performance tests, and assisted in the resolution of mechanical system operational problems.
systems tested
4 gas-fired, multizone air handling units, 1 heating and ventilation air handling unit, 2 computer roof air conditioning units, 2 cabinet unit heaters, 3 units heaters, 2 active smoke evacuation systems, and 1 steam boiler system.